Commit Graph
4 Commits
Author SHA1 Message Date
Nick SzaunigandClaude Opus 5.5 ef33e5549b feat: T4 wave 5 - colony end cleanup, withdrawal chain, next steps, inspection takeover UI
- Colony end releases the queen in the same transaction; open
  suggestions become obsolete and a CLEANUP suggestion lists open
  tasks and the queen; apply-cleanup validates evidence and blocks
  reactivated colonies
- Withdrawal chain: plausibility warnings on harvest and bottling,
  conflict notifications also when a treatment is entered or corrected
  after the harvest (naming bottled lots), withdrawal spans in the
  calendar and M365 sync, Berlin-day end events
- Next 3 steps per colony and the "Heute" endpoint with ranking and an
  explicit merge table by intent
- Inspection-triggered rule suggestions follow the colony's latest
  inspection (resolve when the finding is gone, refresh when it stays)
- Frontend: colony card takeover in the inspection form, feed status as
  condition, occupied frames 0-40; legacy offline entries keep syncing
- Notifications and preferences are deleted with their user

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-10-14 16:28:07 +02:00
Nick SzaunigandClaude Opus 5.5 02eb16924e feat: T4 wave 4 - rules suggest, takeover, chains, autopilot A1-A3, suggestions page, varroa bands UI
- Automation rules propose suggestions instead of creating tasks;
  notify per rule config; corrected varroa measurements refresh or
  resolve their suggestion
- Inspection values can be taken over into the colony card
  (occupiedFrames 0-40, strength deprecated); warning counts use the
  same visibility rule as the notification list
- Biotech chains: swarm check after queen cells, queen acceptance
  check, split schedules (raise own, queen cell, queen)
- Season autopilot core with A1 inspection due, A2 varroa measurement,
  A3 recheck after treatment; colony sync and daily step
- Frontend: suggestions page with groups, bulk accept, undo, paging,
  focus management and permission gating
- Frontend: varroa traffic light from seasonal bands, sample size,
  one range request for the colony chart
- Notifications: mark-read answers 404 for rows the user may no
  longer see

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-10-14 15:22:36 +02:00
Nick SzaunigandClaude Opus 5.5 f468dc5f75 feat: T4 wave 3 - notifications per user, suggestions API, varroa bands, split/queen events
- Schema III: per-user notifications (broadcast fan-out migration,
  category, link, requiredPermissions filter), notification preferences
  and settings endpoints, calendar withdrawal switch, occupiedFrames
- Suggestions API: list/summary with permission visibility and paging,
  accept/dismiss/reopen incl. bulk, SuggestionView on all responses
- Varroa traffic light by season and method, young colonies, treatment
  effect window, sample-based percentage; shared withdrawal-window helper
  on Berlin calendar days; GET /varroa-measurements/thresholds
- ColonySplit and QueenAssigned domain events with calendar and webhook
  handlers
- Outbox claims compare against now() rounded to timestamp(3); fixes the
  flaky e2e claims of rows written with SQL now()

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-10-14 14:25:24 +02:00
Nick SzaunigandClaude Opus 5.5 c01a38835a feat: platform backbone and field capture, first part (checkpoint)
Platform backbone (plan 2026-10-13-plattform-rueckgrat), reviewed tasks:
- run roles api/worker/job/all with shared startup checks (Task 1)
- schema and migration for DomainEvent, deliveries, JobRun, ThrottlerHit (Task 2)
- audit, notifications and domain events written in the same transaction (Task 3)
- dispatcher with SKIP LOCKED claims, retries and stale release (Task 4)
- worker building blocks: tick, LISTEN/NOTIFY wake-up, health (Task 5)
- worker process and entry points (Task 6)
- throttler counters in Postgres (Task 19)
- separate keys per purpose with key ring (Task 20)
- public origin page without exact location (Task 22)
- shop keys split into read and write (Task 23)
- Kustomize base, components, overlay encry, CI validation (Task 26)

Field capture T3 (plan 2026-10-13-t3-erfassung-am-stand), reviewed tasks:
- brood frames, read endpoints, apiary overview and offline pack
- network basics, offline queue v3, navigation sheets, form building blocks
- new inspection with last-time hints and weather, varroa per day,
  treatment prefill, apiary page with round
- inspection photo (Task 10) is implemented, review pending

Not rolled out. Remaining tasks follow in later commits.

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-10-13 17:57:54 +02:00