Commit Graph
2 Commits
Author SHA1 Message Date
Nick SzaunigandClaude Opus 5.5 cdd30cf3ee feat: platform backbone and field capture complete (checkpoint)
Platform backbone (plan 2026-10-13-plattform-rueckgrat), all tasks reviewed:
- webhooks with delivery table, retries and stable delivery id
- calendar handlers; a finished task removes its Outlook event
- tasks, automations, inspections, varroa, treatments, feedings,
  harvests, colonies, wintering, stock and bottling record domain events
  in the same transaction; legacy post-commit calls removed
- row locks through one helper (lockRowForUpdate, lockRowsForShare,
  lockRowsForUpdate)
- job framework with JobRun, cli exit codes, cleanup, task templates,
  daily evaluation, hourly app-backup and the rekey job
- system API and page "Verwaltung > System" with retry
- @nestjs/schedule removed, guard tests against in-process schedulers

Field capture T3 (plan 2026-10-13-t3-erfassung-am-stand), all tasks reviewed:
- inspection photo offline without metadata
- bulk capture for treatments, feedings and varroa (backend + frontend)
- offline stand mode with service worker, offline pages and packs
- offline session, cold start and logout on shared devices

Docs: ARCHITECTURE.md assumptions and sections updated, TASKS.md.
Gates: backend lint, typecheck, 1770 unit, 420 e2e, build, no schema
drift; frontend lint, typecheck, 913 tests, build. Not rolled out.

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-10-14 11:36:38 +02:00
Nick SzaunigandClaude Opus 5.5 5cf4e87ca3 feat(automation): suggest follow-up checks after treatments and feedings
Two new rules, "Kontrolle nach Behandlung" and "Kontrolle nach
Fütterung", create a check task when a treatment or feeding is recorded.
The due date counts from the measure itself (end of treatment, else its
date; feeding date) plus the configured number of days, and the task
names the product and date. At most one open check per colony and rule.

Both rules ship switched off and without an interval: the right timing
depends on the product (package leaflet) and season, so the beekeeper
sets it. Every task-creating rule can now carry a "due after N days"
setting in the automation page.

Co-Authored-By: Claude Opus 5.5 (1M context) <[email protected]>
2026-09-28 06:23:13 +02:00